Façade surveying for high-rise buildings and commercial and industrial buildings

When installing curtain walls, aluminium, steel, prefab or natural stone cladding only small tolerances are allowed. Once the building shell is finished, the axes are adopted and the deviations from the concrete shell are measured.

We can turn these measurements into a report and survey drawings, so you can take appropriate action. You need detailed measurements or setting out at each floor for your mounting. We go along with your planning and come to set out axes, façade lines, reference points and meter marks floor by floor again.